language
Company:Guangdong PENGLAI Intelligent Equipment Co.,LTD
Factory Address:403B, No.99 Qiaocheng East RD,Nanshan District,Shenzhen,Guangdong ,China
Factory ADDRESS:St George Industrial Park,XinYu Road,ShaJing Town,Bao'an District,Guangzhou City,China
Contact:Jack Du
Cel:+86-15811882441
Phone:+86-755-86718316
Fax:+86-755—25417648
Email:penglaipacking@gmail.com
Email:postmaster@penglaipacking.com
Skype:turnanewleaf
Website:www.penglaichina.com
www.youtube.com/user/penglaichina
YX-LM520-L03 multilanes packing machine VFFS packaging bagging solution is a full automatic packing machine with high quality and high performance made by this co.,ltd through introducing, digesting and absorbing advanced technology from abroad, and has a series of automatic functions, such as automatic-delivering, measuring, bag-making, sealing, date printing, finished product exporting.
This machine adopts high precision servo film-transferring system, PLC program control, advanced touch-type human machine interface, photoelectric automatic positioning tracing and digital type temperature control, which make operation of the complete machine simpler, perfect, and it is the first-choice equipment for improving producing efficiency, decreasing labor intensity, upgrading packing level in food packing industry.
Performance and Specifications of multilanes packing machine VFFS bagging system:
Notice: Packing speed according to packing material and packing weight .packing materials should be used in rolls, the outer diameter should be ≤400mm, inner diameter of framework should be Φ75mm, thickness of compound packing material should be 0.05-0.08mm, surface of the packing material should be smooth without wave, in the range of 10mm on the side should not have printed pattern and characters (namely the grounding should be pure), contrast between color dot and grounding should be obvious.
2.A►Arrangement plan of the complete machine
3. Installation notice
1). Packing machine and finished product transferring machine should be connected with 220VAC power supply with earth leakage protection and a current of more than 10A
2). Automatic lifting machine should be connected with 3-phase 380VAC power supply with earth leakage protection and open-phase protection and a current of more than 10A.
3). Please don’t forget to install earth wire.
4). Connect the air source with entrance of triplet of packing machine.
5). Use elevator to transfer material into big material hopper at the top of packing machine.
6). Install date printing ink ribbon
7). Install packing film.
1)Loosen the handle |
2)Put in packing film |
3) Bold line direction indicated in the chart passes through the packing film and move it along a continuous line, and lead the packing film into the bag former(Vertical sealing device should be opened first). |
4)After lead the packing film enter bag former, adjust swing lever to make packing film pass through feeding tube. At this time, film-delivering switch and film motor at the bottom of packing machine enter automatic work status.
Operation methods
1) Open the total power of the machine, then preheat the vertical and horizontal sealing jaw date printer to the temperature setting and the horizontal sealing jaw which parts should be add some adequate lubricating oil.
2)Please pay attention to check the cleanliness of the tooth surface of vertical and horizontal sealing jaw.
3)Please check the equipment of the code date, packing film right or wrong, and check the Electronic location.
4)Open the switch of the printer of the date, and send the packaging film to the intended location. Open the motor, make 4-5 empty bags and then stop it. Check the bags is qualified, if done then open the materials falling switch to work.
5)First to shut down the materials falling switch when it needs to cut off the power,and then related the electrical power supply ,so as not to damage folders, tool damage.
Equipment maintenance
1)Before on or off duty, it is necessary to clean interior and exterior of the machine, thoroughly sterilize the parts passed by food
2)Before on or off duty every day, please check if 1/3 of the oil table of air source air source triplet oil storage jar is maintained, is less, it is necessary to pour 20# pure and clean oil until about 1/2 of the jar body.
3)Before start every day, pour 20# machine oil into oil cup on the horizontal sealing support until it becomes full.
4)Before off duty, it is necessary to take off unused packing film so as to prevent from bending supporting tube.
5)During the process of start, if material is clamped in vertical sealing or horizontal sealing, it is necessary to stop the machine immediately and clean tooth surface of vertical sealing or horizontal sealing with brass wire brush.
►Spare parts list
horizontal sealing heater 4 set
vertical sealing heater 1set
interior hexagonal spanner 4-10mm 1 set
copper brush 120mm 1 piece
cutter 220mm 1set
oil kettle 150ml 1 piece
character grain 1 box
ALL RIGHTS RESERVED by ®PENGLAI INDUSTRIAL CORPORATION LIMITED
Copyright © Guangdong PENGLAI Intelligent Equipment Co.,LTD