language
Company:Guangdong PENGLAI Intelligent Equipment Co.,LTD
Factory Address:403B, No.99 Qiaocheng East RD,Nanshan District,Shenzhen,Guangdong ,China
Factory ADDRESS:St George Industrial Park,XinYu Road,ShaJing Town,Bao'an District,Guangzhou City,China
Contact:Jack Du
Cel:+86-15811882441
Phone:+86-755-86718316
Fax:+86-755—25417648
Email:penglaipacking@gmail.com
Email:postmaster@penglaipacking.com
Skype:turnanewleaf
Website:www.penglaichina.com
www.youtube.com/user/penglaichina
shrink tunnel machine electric heating steam for shrinkage wrapping packaging shrink wrap machines
YX Series Steam shrink tunnel/ Electrical heating shrink tunnel
Steam Shrink Tunnel , Electrical Shrink Tunnel Facility character:
1. Whole machine adopt qualified stainless steel and good-quality of aluminum alloy , compact and reasonable fracture,
convenient to adjust
2. The label roll frame of shrinkage film with adjustable device, convenient to adjust according to differ volume label 5~10paper tube.
3. Simply installation, then can convenient for square and round bottle.
4. No need of instrument, rotary mechanism is convenient to adjust, apply to different bottle type.
5. Unique sleeve labeling method, adopt pressing sleeve labeling method, not only convenient but also reasonable.
6. Control the feeding system automatically, and flat the shrinkage film and adjust strain simultaneity.
7. Unique design knife plate, in the determined range, can change the knife base. Knife changing quickly and conveniently.
8. Middle guide-pole clip system, mould changing quickly, no need any instrument.
9. Label location system, can promote and demote in-phase adjust location according to specific bottle type requirement.
10. Imported servo system and high-sensitivity photoelectric from Japan, with high cutting precision of label.
11. Stainless steel electric control cabinet, OMRON PLC, imported from Japan.
12. Adopt advanced man-computer Interface auto controlling technology, key electric component all adopt international famous
industrial brand.
Steam Shrink Tunnel , Electrical Shrink Tunnel for bottles Technical Parameters
Specification Parameters |
18KW |
24KW |
36KW |
48KW |
Rating steam generating |
24 |
32 |
48 |
64 |
Rating steam pressure |
0.4/0.7 |
0.4/0.7 |
0.4 |
0.4 |
Rating steam temperature |
151/170 |
151/170 |
151 |
151 |
Water temperature |
20 |
20 |
20 |
20 |
Electric power |
18KW |
24KW |
36KW |
48KW |
Pump motor power |
550 |
750 |
750 |
750 |
Diameter of safety valve |
DN15 |
|||
Diameter of main steam valve |
||||
Diameter of drain valve |
||||
Diameter of water supply valve |
||||
Boiler water volume |
42 |
|||
Size appearance (mm) |
630*550*1400 |
720*650*1350 |
1030*630*1350 |
1030*630*1350 |
Boiler weight |
85KG |
90KG |
195KG |
195KG |
Steam generator
The water is fed into the series of wholly automatic electrical heating generator by high pressure potential vortex pump made of copper with short water-supply time and durable service. A floating ball for liquid level is fixed in the water tank to automatically control the water inlet. Working system is all automatically controlled. After connecting the water supply and power supply for 5 minutes or so, it can output the steam continuously with a high level of working efficiency.
Power consumption:18KW
Steam pressure:0.25-0.4Mpa
Steam capacity:24Kg/h;
Size:600L×550W×1200H
Weight:196Kg
Options for shrink tunnel electric or steam heating way:
Pre-heat device for extended shaping
Steam generator
Conveyor belt
Conveyor system
Labeler
Shelf
Service from us
The sample service:we can send you the video of the running machine. You are welcome to come to visit our company,and see the machine running in our factory.we can pick you up from the station near our city. If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
Customized service:we can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
After-sales service:we will provide the bill of load on time to make sure you can get the machine quickly .when you finish the Preparation conditions ,our engineer will go to your factory to install the machine ,and give you the operating manual ,and train your employee until they can operate the machine well. we provide one year warranty with spare parts free.
Copyright © Guangdong PENGLAI Intelligent Equipment Co.,LTD