language
Company:Guangdong PENGLAI Intelligent Equipment Co.,LTD
Factory Address:403B, No.99 Qiaocheng East RD,Nanshan District,Shenzhen,Guangdong ,China
Factory ADDRESS:St George Industrial Park,XinYu Road,ShaJing Town,Bao'an District,Guangzhou City,China
Contact:Jack Du
Cel:+86-15811882441
Phone:+86-755-86718316
Fax:+86-755—25417648
Email:penglaipacking@gmail.com
Email:postmaster@penglaipacking.com
Skype:turnanewleaf
Website:www.penglaichina.com
www.youtube.com/user/penglaichina
Our US customer from NY purchased one(1*) set of vacuum emulsifier machine which has the basic requirements according to the contract as below:
350L mixing tank model YX-VME350L
Mark for the 300L mixing tank
Main 350 liter316 SS vacuum scraper tank
Load cell weight information
Homogenizer
220 liter water pot with electric heating
Control Panel
After one month's careful manufacturing of vacuum emulsifier we finally finished the production of vacuum mixer 350l model YX-VME350L .
Before delivery we have sent the test-run of the machine video&pictures to our customer getting their positive feedback then prepared for the
ocean shipping for the buyer by ourselves under incoterms CIF
As below is the basic info for the transaction:
Payment Bank slip Copy for vacuum mixing machine 350L customized mixer with load cell weighing system
Testing run of video for model YX-VME350 vacuum emulsifier cream honey paste mixing euqipment
Wooden crate packaging before ocean shipping to NY for vacuum emulsifier equipment 350L
As follow is the basic description of vacuum emulsifier YX-VME series customized mixer for our USA customer accordingly
1.Main Boiler (Double Layer) |
|||
No |
Item |
Configuration and Parameters |
Mark |
1.1 |
Volume |
Overall volume:330L;Working Volume:300L |
Loading Coefficiency 0.8 |
1.2 |
Heating |
Steam heating Power:13KW |
|
1.3 |
Basic Structure |
Double Layer,Lifting cover,tilte the tank to discharge, scraped agitatorin the upperside, |
|
1.4 |
Tank |
Material contact later:SUS316L; Thickness:6mm; Jacket 6mm; Outer:SUS304,Thickness:2.5mm |
Total Thickness:50mm |
1.5 |
Cover |
Material filter,Vacuum Pressure meter, Vacuum Exhaust Valve,Vacuum Port,sight glass light, Vision window,inlet,perfume Hopper; |
No Dead space, |
1.6 |
agitator |
scraped |
SUS316L |
Stirring coefficiency: |
Stirrer motor:5.5KW,Speed:0~63R/M; |
Motor(SIEMENS), |
|
1.7 |
Homogeneous Way |
Installation,internal circulation; |
SUS316L |
Homogeneous |
Motor Power11KW,Rotating speed 3000R/M |
Motor(SIEMENS) |
|
Processing |
Rotor and Stator in Wire cutting,assembled after polishing |
Balance process axle |
|
1.8 |
sealing |
Burgmann Machinery Seal,Japan NSK Rolling Bearing; |
|
1.9 |
polishing |
In&outside hygiene grades,conforming GMP standard |
S320U |
2.Water Boiler |
|||
2.1 |
Volume |
220L volume |
Loading Coefficiency 0.8 |
2.2 |
Heating |
Steam heating,Tap water cooling |
Power 0.55KW |
2.3 |
Construction |
three layers,down stirring,Botton outlet |
|
2.4 |
Material |
Inner:SUS316,Thickness 3mm |
SGS certificated |
Jacket:Q235B 5mm thickness |
Total Thickness:50mm |
||
Outer shell: SUS304,2mm thickness |
Heat Preservatory:Silicon Sulphate |
||
2.5 |
Agitation |
down blending,power 2.2KW,0-64r/m |
Siemens |
2.6 |
polishing |
300EMSH,GMP standard |
320U |
Item |
Number |
Temperature Controller |
2 |
Heating rods |
2 |
thermocouple |
2 |
O circle |
2 |
O-circle Small |
2 |
Bearing |
2 |
Bearing Small |
2 |
Guarantee: for all the machine, it claims one year for guarantee.
(Excluded from the warranty are problems due to accidents, misuse ,
misapplication, storage damage, negligence, or modification to the Equipment or its components. ALSO THE EASY BROKEN SPARE PART IS NOT INCLUDED IN THE GUARANTEE)
Installation: after the machine arrive your factory,if you need,our technician will go to your place to install and test the machine and also training your worker to operating the machine
(The time of train depend on you worker). The expenses (air ticket ,food , hotel,the travelling fee on your country) should be on your account and you need paid for the technician USD50 per day.
also you can go to our factory to do training.
After service: If you get the problem on the machine ,our technician will go to your place to fixed the machine as soon as possible. The cost should be in your account.(as above).
Copyright © Guangdong PENGLAI Intelligent Equipment Co.,LTD